stage 1 pool renovation completed Natare wetdeck gutter

Murray Bridge Swimming Centre

Murray Bridge Swimming Centre
Community Pool – Murray Bridge, South Australia

Stage 1 of The Murray Bridge Swim Centre Master plan has been completed and the results are spectacular. Works have improved the visual appeal of the pools, however, the real beauty is in the water treatment system. This system has given residents and visitors access to crystal-clear water for swimming.

The renovation works include custom-designed stainless steel gutters, a Vacuum sand filter and commercial-grade vinyl liner. While we did explore more traditional renovation options for the project the cost advantages and risk elimination offered by the modular stainless system to rejuvenate the ageing pool were too significant to ignore.

Swimming Pool and Spa Association Award Results

A technically challenging project the Murrary Bridge Swim Centre Stage 1 works were recognised by the Swimming Pool and Spa industry as one the top commercial renovations in South Australia.

  • 2021 – Highly Commended – Commercial Renovation (South Australia)

Murray Bridge Swim Centre Pool Renovation 

For more details on the  Pool System installed at Murray Bridge, please download the fact sheet.

Get the latest in aquatics news
  • This field is for validation purposes and should be left unchanged.